ASIC HW5 1200kW
Mining Container
High-performance, all-in-one infrastructure for large-scale ASIC mining. Liquid cooling. 210 units. Plug & play. Revenue from day one.
Stop Missing Out.
Scale Your Mining Operation.
The HW5 1200kW is not just a container — it’s a complete, revenue-ready infrastructure. With capacity for up to 210 Hydro ASICs, this system is built for those who want to scale fast, reduce costs, and maximize profit margins.
Up to 1,200 kW Optimized Power
Full industrial power capacity with superior energy efficiency at PUE ~1.03 — meaning nearly all energy consumed goes directly to mining, not cooling overhead.
State-of-the-Art Liquid Cooling
Forget overheating and constant failures. Advanced liquid cooling technology ensures greater stability, longer equipment lifespan, and consistent performance even in extreme conditions.
40-ft Plug & Play Container
No complex infrastructure needed. Connect, turn on and start mining. The fully integrated 40-foot container is ready for immediate deployment on any site.
Up to 210 ASICs in One Unit
Ideal for professional mining farms and industrial operations. Rapid and modular expansion allows you to go from small investor to large-scale operator in weeks.
Industrial-Grade Reliability
Designed for intensive 24/7 operations with high-performance industrial components. Safety and stability guaranteed by engineering built for continuous maximum output.
Revenue From Day One
Fully commissioned and tested before delivery. No ramp-up period — the HW5 is mining at full capacity from the moment it’s powered on at your location.
Full Container Specs
| Specification | Detail | Value |
|---|---|---|
| Container size | Standard shipping container | 40 feet |
| Total power capacity | Maximum installed power | 1,200 kW |
| ASIC unit capacity | Hydro-cooled ASIC miners | Up to 210 units |
| Cooling system | Liquid / Hydro cooling | State-of-the-art |
| PUE (Power Usage Effectiveness) | Energy efficiency ratio | ~1.03 |
| Operation | Uptime capability | 24/7 continuous |
| Installation | Setup complexity | Plug & Play |
| Target operation | Ideal use case | Professional mining farms |
| Expansion | Scalability | Rapid & modular |
| Payment | Accepted methods | BTC · USDT · Wire Transfer |
Why the HW5 Changes
Your Mining Economics
Every detail of the HW5 is engineered to reduce your cost per hash and maximize your daily profit margin at scale.
Reduce Electricity Costs
PUE ~1.03 means minimal wasted power. At 1,200 kW capacity, even a small PUE improvement translates to thousands of dollars saved monthly.
Zero Infrastructure Complexity
The container arrives fully built, tested, and ready. No construction, no HVAC design, no electrical engineering — just connect power and start mining.
Protected Investment
Liquid cooling dramatically extends ASIC lifespan compared to air cooling. Your hardware runs longer, fails less, and generates more total revenue over time.
Industrial Scale From Day One
Skip the gradual scale-up. Deploy 210 ASICs simultaneously and start earning at industrial capacity immediately — not after months of setup.
Ideal for US Hosting
Deploy at our $0.065/kWh US facilities in Texas or Wyoming — or at your own site. The HW5 is designed to work anywhere with the right power supply.
Modular Expansion
Add more containers as your operation grows. Each HW5 unit is a self-contained profit center — scale by adding units, not redesigning infrastructure.
Secure Your HW5 1200kW Container Now
Each available unit represents a direct opportunity to generate income at industrial scale.
The time you lose today is profit you won’t generate tomorrow.



